Parkview North Hospital

Parkview Hospital needed a design to fuel helicopters on the roof at the new Parkview North location. This meant pumping and managing jet fuel six stories above the tank and pumps.

Gasoline Equipment made sure the system design met regulations and security requirements.

Details

Wabash Municipal Airport

We got a call about the airport’s fueling system with a serious leak and fuel was spraying from a hose reel. Gasoline Equipment fixed the leak even while a plane hit a light on the runway closing the airport.

We repaired the light in addition to the fuel system and returned the airport to operation. Our priority was solving the customer’s needs, even when it meant working “outside the lines.”

Details

Turner Construction

Turner Construction needed a new fuel system at their Bedford, IN site. They had secured a tank and provided containment, and Gasoline Equipment installed appropriate fill mechanisms and piping.

Details

Bulk Plant

Gasoline Equipment completed the commission of a new bulk plant for an important customer. The facility was designed and built on a greenfield site. The plant has been in operation for a few months now and all is going smoothly.

Details